1·Pacoima dam, USA (1971) - arch dam.
帕克伊马大坝,美国(1971年)——拱坝。
2·Ambiesta dam, Italy (1976) - arch dam.
阿姆·比斯他大坝,意大利(1976年)——拱坝。
3·High arch dam is widely used with it be safety and economy.
高拱坝是安全性和经济性都比较优越的坝型,应用十分广泛。
4·Fault tree analysis is used to analyse the high arch dam risk.
利用故障树分析法对高拱坝进行风险分析。
5·It is an overflow arch dam of the various radius and thickness type.
坝体大不同半径和厚度拱坝并采用坝顶溢流形式。
6·The Linhekou Hydropower Station has a RCC double-curvature arch dam.
蔺河口水电站大坝为碾压混凝土双曲拱坝。
7·The stability of arch dam against elastic buckling has always been ignored.
拱坝的抗屈曲稳定性一直是未被重视的问题。
8·Arch dam construction in China has developed and the quantity stands first.
我国拱坝建设也后来居上,数量已是世界第一。
9·Analysis of stability is one of the complicated problems in arch dam designing.
拱坝稳定分析是拱坝设计中较复杂的问题之一。
10·Take the example of optimization design of arch dam, the results are satisfying.
以拱坝优化设计为例,取得了较为满意的结果。
1·It is an arch dam, which is perfect for that rocky, narrow gorge in which it was built.
这是一座拱坝,建于多石又狭窄的峡谷上真是恰到好处。
2·Ambiesta dam, Italy (1976) - arch dam.
阿姆·比斯他大坝,意大利(1976年)——拱坝。
3·Pacoima dam, USA (1971) - arch dam.
帕克伊马大坝,美国(1971年)——拱坝。
4·Furthermore, model test of Xiluodu's high arch dam is studied and the. Result of stress and displacement is presented in this paper.
此外,本文对溪洛渡高拱坝进行了应力模型试验研究,给出了试验得到的应力、变位结果。
5·Basic theory of nonlinear FEM analysis and its realization in ANSYS were studied. Accomplish stability analysis of high arch dam abutment based on nonlinear FEM analysis.
因此对大型结构分析软件ANSYS的三维非线性计算功能进行了深入研究,在此基础上完成了基于非线性有限单元法的高拱坝坝肩稳定计算分析。